Hard Rock Stadium Bridge Tunnel

Use: Bridge and Tunnel
Location: 347 Don Shula Drive
Size: N/A
Existing Zoning: S- Stadium

This project consist of a pedestrian bridge over the Florida Turnpike access road for the Hard Rock Stadium. A second pedestrian bridge over NW 199 Street and two tunnels under Don Shula Drive. These enhancements are designed to improve pedestrian access and public safety. The construction phase of the project is scheduled for completion in September 2019.